Project 2003 Series: Analyzing Progress and Revising the Schedule
Product Code: prj310 Time: 3.0 hour(s) CEUs: Available

Summary:

This course explains the analysis process and how to revise the schedule. It also explores how to review the current status of the project at the project, task, resource, and assignment levels.

Objectives:

After completing this course, students will be able to:
  • Analyze performance
  • Revise the schedule
  • Review the schedule


Topics:

  • Project Management Overview
  • Reviewing the Current Status of a Project
  • Reviewing Status at the Project Level
  • Reviewing Status at the Task Level
  • Reviewing Status at the Resource Level
  • Reviewing Status at the Assignment Level
  • Analyzing Performance
  • Using Earned Value Analysis
  • Revising the Schedule

Technical Requirements:

200MHz Pentium with 32MB Ram. 800 x 600 minimum screen resolution. Windows 98, NT, 2000, or XP. 56K minimum connection speed, broadband (256 kbps or greater) connection recommended. Internet Explorer 5.0 or higher required. Flash Player 7.0 or higher required. JavaScript must be enabled. Netscape, Firefox and AOL browsers not supported.